Stretch of tunnel called full of defects

Stretch of tunnel called full of defects.
An inspection by Big Dig officials has found a 1,500-foot stretch of
the tunnel near the North End to be the most problem-plagued area of
the project, with weaknesses in the tunnel walls that exceed even those
in the section of tunnel that erupted in a gushing leak last September.
[Boston Globe — Front Page]

Leave a comment